Initial Stage in Designing Household Constructed Wetlands: Selection of a Suitable Aquatic Plant
The best synthetic unit hydrograph for peak discharge analysis Case: The Bengawan Solo River, section Dengkeng–Pusur
link : https://journals.pan.pl/jwld/136140#tabs
The Safety of Bengawan Solo River Embankment at Dengkeng-Pusur Segment in The Return Periods of Discharge
link : https://iopscience.iop.org/article/10.1088/1755-1315/832/1/012057/pdf
Function and Performance Optimization of Kamijoro Dam Redesign through Value Engineering Analysis Application
link : https://iopscience.iop.org/article/10.1088/1742-6596/1912/1/012055