Penerapan Konsep Building Information Modeling (BIM) pada Perencanaan proyek Jembatan
Penulis : Syafi'I,Widi Hartono,Slamet Jauhari Legowo,Tuti Agustin,Amirotul Musthofiah Hidayah Mahmudah
Implementasi Teknologi Penjadwalan Konstruksi Pada Kontraktor PT Intan Pesona Group
Penulis : Syafi'I,Widi Hartono,Slamet Jauhari Legowo,Tuti Agustin,Amirotul Musthofiah Hidayah Mahmudah
Activity and Time Value of Public Passenger Transportation Users During the Covid-19 Pandemic in 2020 (Bus of Batik Solo Trans Corridor 4 in Surakarta)
link : https://ijerjournal.org/index.php/ijer/article/view/12
Tingkat Kedewasaan Penerapan Bim Pada Kontraktor Jembatan Di Indonesia
link : https://jurnal.uns.ac.id/jrrs/article/view/53628
Effects of Road Shoulder Width and Speed Bump Dimensions on Motorbike Speed Reduction
link : https://iopscience.iop.org/article/10.1088/1742-6596/1858/1/012080/meta
Analysis of Walkability Index and Handling of Pedestrian Facilities of Slamet Riyadi Street, Surakarta
link : https://iopscience.iop.org/article/10.1088/1742-6596/1858/1/012011/meta
Probability Analysis of DAMRI Bus Mode Selection on the Operation of Adi Soemarmo International Airport (BIAS) Train
link : https://iopscience.iop.org/article/10.1088/1742-6596/1858/1/012012/meta