Ipteks Bagi Produk Unggulan Batik Tulis dengan Kansei Engineering pada UKMM Kampung Batik Laweyan Surakarta
Penulis : Wakhid Ahmad Jauhari,Cucuk Nur Rosyidi,Haryono Setiadi
Model closed loop supply chain pada pemanufaktur-retailer dengan mempertimbangkan defect, proses sorting dan waste disposal.
Penulis : Wakhid Ahmad Jauhari,Cucuk Nur Rosyidi
Head and facial anthropometry for determining the critical glasses frame dimensions
link : http://jestec.taylors.edu.my/Vol%2011%20issue%2011%20November%202016/11_11_9.pdf
A concurrent optimization model for supplier selection with fuzzy quality loss
link : http://jiem.org/index.php/jiem/index
Considering Children’s Methods of Grasping and Carrying Elementary School Chairs for Easy Carrying, Lifting, and Turning
link : http://journals.sagepub.com/doi/full/10.1177/2158244016678037
Considering children
A Concurrent Optimization Model for Supplier Selection with Fuzzy Quality Loss
link : http://jiem.org/index.php/jiem/article/view/800
Inventory decisions in a two-echelon system with remanufacturing, carbon emission, and energy effects
link : https://www.cogentoa.com/article/10.1080/23311916.2017.1379628
A supply chain inventory model for vendor-buyer system with defective items and imperfect inspection process
link : http://www.inderscience.com/info/inarticle.php?artid=87740
The evaluation of criteria and subcriteria of research project selection using fuzzy analytical hierarchy process method
link : http://ieeexplore.ieee.org/document/7910429/?part=1
A closed-loop supply chain model for supplier-manufacturer-retailer system with rework and waste disposal
A closed-loop supply chain inventory model for manufacturer - Collector system with inspection, waste disposal and price-quality dependent return rate
link : http://aip.scitation.org/doi/abs/10.1063/1.5010645
A collaborative inventory model for vendor-buyer system with inspection errors, unequal sized shipment, and repairable item
link : http://aip.scitation.org/doi/abs/10.1063/1.5010621
Inventory model optimization for supplier manufacturer-retailer system with rework and waste disposal
link : http://iopscience.iop.org/article/10.1088/1757-899X/245/1/012016/meta
Open pit mining profit maximization considering selling stage and waste rehabilitation cost
link : http://aip.scitation.org/doi/pdf/10.1063/1.5010639
Multi-objective optimization model of CNC machining to minimize processing time and environmental impact
link : http://aip.scitation.org/doi/abs/10.1063/1.5010653
The evaluation of criteria and subcriteria of research proposals using ANP method
link : http://aip.scitation.org/doi/abs/10.1063/1.5010671